After assembling of biogas plant how can we ensure the the initiation of gas production?
Biogas-Plant Assembly-of-the-Biogas-plant 18-19 min 40-50 sec
Answers:
After 17 days of total curing time the raw material can be put into the Biogas plant.
Initial production of Biogas will take about 6 days. After that, it will be a regular daily production.
To check whether Biogas has been produced, do the following -
** Ensure that both the safety valves are in open position, for the gas to be conveyed.** Light the burner and check the flame for production of the Biogas.
Pls watch the Spoken Tutorial - Assembly of the Biogas plant.